Environment, K-12 Eileen Kaley Environment, K-12 Eileen Kaley

Comprehensive Envrionmental Audit

SSM performed a comprehensive environmental audit of the St. Joseph Medical Center complex, Citadel Campus, which consisted of five buildings ranging in size from two to six stories.

READING SCHOOL DISTRICT & ST. JOSEPH MEDICAL CENTER

Reading School District & St. Joseph Medical Center

Reading, Pennsylvania

SSM performed a comprehensive environmental audit of the St. Joseph Medical Center complex, Citadel Campus, which consisted of five buildings ranging in size from two to six stories. This audit was conducted while the facility was in operation and included Phase I and Phase II environmental site assessments, an asbestos survey, a lead survey, a mold survey, and a hazardous materials inventory. This work was completed as part of a pending property transaction and site reuse.

Four underground storage tanks were removed as part of the project; two of which required active soil remediation. The site has been remediated to residential standards and attainment of these standards has been demonstrated. This will result in the relief of environmental liability for St. Joseph Medical Center, Reading School District, and all future owners of the property.

In addition, SSM industrial hygienists also conducted a PCB investigation, mercury investigation, ozone depleting chemical investigation, and a search for radioactive materials that might have remained in the hospital.

ST. JOSEPH MEDICAL CENTER DEMOLITION

ST. JOSEPH MEDICAL CENTER DEMOLITION

Read More
Environment, Buildings, State Government Eileen Kaley Environment, Buildings, State Government Eileen Kaley

Mold Inspection Prior to Construction

Performed a detailed mold inspection and sampling of the Virginia State Capitol Building prior to the initiation of construction and renovation of the building and replacement of the building ventilation systems.

VIRGINIA STATE CAPITOL

The Hillier Group

Virginia State Capitol Building

Performed a detailed mold inspection and sampling of the Virginia State Capitol Building prior to the initiation of construction and renovation of the building and replacement of the building ventilation systems. This project was initiated since given the age of the building and the ventilation system, the presence of mold was suspect.

The inspection, sampling and recommendations and specifications for remediation were completed in accordance with guidelines established by the Environmental Protection Agency for Mold Remediation in Schools and Commercial Buildings.  In areas were visible mold was observed, SSM collected swab samples to confirm the presence of mold and air samples for fungi were collected to determine if airborne contamination was present.

Read More