Education, Environment Eileen Kaley Education, Environment Eileen Kaley

Asbestos Survey and Assessment | AHERA Management Plans

Conducted an asbestos survey and assessment and delivered AHERA Management Plan.

Harford County School District

Harford County, Maryland

Conducted an asbestos survey and assessment and delivered AHERA Management Plans including review of existing drawings, previous asbestos inspections, and current Management Plans for 60+ buildings including re-locatables. Identification, assessment, and identification of all asbestos containing material (ACM) throughout the buildings in accordance with the most current AHERA and EPA regulations. Assessment and documentation of both the condition of any ACM not previously identified and previously identified ACM.

Read More
Environment, Gallery, State Government Eileen Kaley Environment, Gallery, State Government Eileen Kaley

Asbestos Management Services

Our indoor air quality specialists provided asbestos management services for 8 historic steam engines and one passenger train car at the Railroad Museum of Pennsylvania.

Frens and Frens Restoration Architects

Railroad Museum of Pennsylvania

Strasburg, Pennsylvania

Asbestos abatement oversight operations at the Railroad Museum of Pennsylvania located in Strasburg, Pennsylvania. This project involved the removal and disposal of asbestos from eight historic steam engines and one passenger train car and the subsequent re-painting of the steam engines with a protective coating. The project included meetings with Museum employees and contractors updating progress and budgetary concerns. Added to this project were oversight operations for the removal of asbestos from two Steam Traction Engines at the Landis Valley Museum located in Lancaster, Pennsylvania.

Read More
Environment, K-12 Eileen Kaley Environment, K-12 Eileen Kaley

Comprehensive Envrionmental Audit

SSM performed a comprehensive environmental audit of the St. Joseph Medical Center complex, Citadel Campus, which consisted of five buildings ranging in size from two to six stories.

READING SCHOOL DISTRICT & ST. JOSEPH MEDICAL CENTER

Reading School District & St. Joseph Medical Center

Reading, Pennsylvania

SSM performed a comprehensive environmental audit of the St. Joseph Medical Center complex, Citadel Campus, which consisted of five buildings ranging in size from two to six stories. This audit was conducted while the facility was in operation and included Phase I and Phase II environmental site assessments, an asbestos survey, a lead survey, a mold survey, and a hazardous materials inventory. This work was completed as part of a pending property transaction and site reuse.

Four underground storage tanks were removed as part of the project; two of which required active soil remediation. The site has been remediated to residential standards and attainment of these standards has been demonstrated. This will result in the relief of environmental liability for St. Joseph Medical Center, Reading School District, and all future owners of the property.

In addition, SSM industrial hygienists also conducted a PCB investigation, mercury investigation, ozone depleting chemical investigation, and a search for radioactive materials that might have remained in the hospital.

ST. JOSEPH MEDICAL CENTER DEMOLITION

ST. JOSEPH MEDICAL CENTER DEMOLITION

Read More
K-12, Environment, Education Eileen Kaley K-12, Environment, Education Eileen Kaley

Asbestos Management

Performed all asbestos-related engineering services related to the Old Senior Hall renovation project.

THE MILTON HERSHEY SCHOOL

The Milton Hershey School

Hershey, Pennsylvania

SSM performed all asbestos-related engineering services related to the Old Senior Hall renovation project, including a comprehensive asbestos inspection of the facility, asbestos abatement design, bidding services, air monitoring and contractor oversight during the abatement, and project management services to support the ongoing renovation project.

Read More
Education, Environment, K-12, Site Engineering Bruce Bell, PE, LEED AP Education, Environment, K-12, Site Engineering Bruce Bell, PE, LEED AP

Multi-Discipline Engineering

Architectural engineering for the Elementary Center and a new natatorium.

WYOMISSING AREA SCHOOL DISTRICT

Wyomissing Area School District

Wyomissing, Pennsylvania

Facility Engineering - HVAC, plumbing, fire protection and electrical systems design for an Elementary Center project involving the addition of 12 new classrooms, a new gymnasium, a new administration wing, and renovations to the existing school.

Construction Phase Services - Services included review of applications for payment, review of shop drawings, site observation, and resolution of construction issues related to mechanical, electrical, and plumbing work.

Indoor Air Quality - Construction phase activities related to protecting indoor air quality in an occupied school building during construction activities.

Facility Engineering - HVAC, plumbing, fire protection, and electrical systems design for a new natatorium.

Site Engineering - Services including administration of Borough review process on behalf of the District, grading plan, stormwater management plan, and landscaping design for a new field house.

WYOMISSING AREA SCHOOL DISTRICT

Read More
Environment, Buildings, State Government Eileen Kaley Environment, Buildings, State Government Eileen Kaley

Mold Inspection Prior to Construction

Performed a detailed mold inspection and sampling of the Virginia State Capitol Building prior to the initiation of construction and renovation of the building and replacement of the building ventilation systems.

VIRGINIA STATE CAPITOL

The Hillier Group

Virginia State Capitol Building

Performed a detailed mold inspection and sampling of the Virginia State Capitol Building prior to the initiation of construction and renovation of the building and replacement of the building ventilation systems. This project was initiated since given the age of the building and the ventilation system, the presence of mold was suspect.

The inspection, sampling and recommendations and specifications for remediation were completed in accordance with guidelines established by the Environmental Protection Agency for Mold Remediation in Schools and Commercial Buildings.  In areas were visible mold was observed, SSM collected swab samples to confirm the presence of mold and air samples for fungi were collected to determine if airborne contamination was present.

Read More