Buildings, Commercial, Gallery Patrick McCoy, PE, LEED AP, CSDP Buildings, Commercial, Gallery Patrick McCoy, PE, LEED AP, CSDP

Structural Engineering for New Animal Hospital

SSM's structural engineers provided design engineering for the roof, floor wall/pier, and foundation to meet the challenging wind and seismic conditions demanded by the project location and our technical experts worked closely with the rest of the design and construction.

ANIMAL CARE HOSPITAL HUMANE SOCIETY OF ST. THOMAS

Humane Society of St. Thomas Animal Care Hospital

St. Thomas, US Virgin Islands

SSM's engineers provided structural engineering for multiple buildings at this complex to meet the challenging wind and seismic conditions demanded by the project location. Our structural engineers worked worked closely with the rest of the design and construction team (consisting of SSM, Caribbean and California-based architects and consultants).

The structural design included extensive retaining wall design for this hill top site, as well as 3 large underground cisterns to hold water for the entire complex.

Working with Caribbean and California-based architects and consultants, SSM carried out a structural design that included extensive retaining wall design for the hill-top site, as well as three large underground cisterns to hold collected rainwater for the entire complex.

Landscape architects and civil engineers provided site and civil engineering services, integrating the architectural plans with the site in terms of vehicular and pedestrian circulation, landscaping, and exterior site features. In addition, provided sewage treatment plant design and collection system design.

ANIMAL CARE CAMPUS HUMANE SOCIETY OF ST. THOMAS

Read More
Construction Services, Gallery, Parks and Recreation, Wastewater, State Government Patrick McCoy, PE, LEED AP, CSDP Construction Services, Gallery, Parks and Recreation, Wastewater, State Government Patrick McCoy, PE, LEED AP, CSDP

Multi-Disciplined, Indefinite Delivery Contract

SSM has supported several teams to serve in a multi-disciplinary way to the Department of Architecture and Preservation (DAP) of the Pennsylvania Historical and Museum Commission (PHMC) since 1995.

WASHINGTON CROSSING | PA HISTORICAL MUSEUM COMMISSION

Pennsylvania Historical and Museum CommissionWashington Crossing Historic Park

Bucks County, Pennsylvania

Pidcock Creek Stone Bridge | prepared design plans and technical specifications for the construction requirements, including site excavation and backfill, grading, gabion installation, bridge deck repairs and paving, stormwater conveyance, and significant amount of masonry repairs.  

Repairs to Dam #1 | Prepared drawings and specifications. Repairs included the rebuilding of sections of the stone and concrete dam crest, the replacement of the valve on the outlet pipe, the removal of sediment deposited in the vicinity of the inlet gate; and stream bank stabilization.

Repairs to Canal Bridge | Prepared and submitted a Pa DEP General Permit #11, including the permit application and meetings with Pa DEP. Prepared design plans for the re-construction of the roadway and bridge including plan and profile designs and grading.

Heritage Trail | Coordinated with the Delaware and Lehigh Heritage Corridor and the Bowman’s Hill Wildflower Preserve to replace a stone trail to connect the Delaware Canal to the Thomson Neely Grist Mill. Conducted a topographical survey of the area and designed a conceptual alignment of the redesigned trail to meet ADA/ABA accessibility standards. The alignment of the revised design, situation behind the mill, also provided a lower impact on the historic significance on the site.

Wastewater Treatment, Collection and Management | Obtained the PA DEP NPDES permit renewal and provided recommendations for equipment/process rehabilitation and/or replacement required to resume operations and discharge at the Lower Park Wastewater Treatment Plant. Provided recommendations and cost estimates for repairs, replacement, and improvements.

Lumber Museum, Galeton PA | Sewage System Evaluation and Design | Evaluated alternative methods of wastewater disposal. The methods were (1) to collect the wastewater and treat on-site by equalization storage, septic tanks with effluent filter, followed by a drip irrigation method of soil absorption, including further filtration and distribution to woodland soils, and (2) collect the wastewater, and pump it to the Denton Hill facility located across U.S. Route 6, and Nine-Mile Run stream. SSM subsequently designed a drip irrigation wastewater system as an alternative to the inadequate system. The process involved land surveying, preparing drawings and specifications for the preliminary and final designs, securing permits, providing bidding assistance, and overseeing construction services.

Valley of Concentration | Well Replacement | SSM located well site located, coordinated well drilling activities with Upper Makefield Township Department of Code Enforcement and the well driller, collected hydrogeologic data during drilling, and collection and reporting of water level data collection for PA DEP permit application.

 

Read More