Capturing heights in dangerous conditions.
/SSM’s scanning team provided Seiler + Drury Architecture with high definition scanning services of the exposed face of the eastern side of 241 Chestnut Street, Philadelphia PA.
Read MoreSSM’s scanning team provided Seiler + Drury Architecture with high definition scanning services of the exposed face of the eastern side of 241 Chestnut Street, Philadelphia PA.
Read MoreCome Celebrate with us! Expanding Footprint, Growth and Changing Workspace Requirements.
The new SSM Lancaster Regional Office opened August 1, 2018 and is located in the Newport Commons community at 701 Creekside Lane in Lititz, PA.
Read MoreWith less than one thousand shopping malls left in the United States, it’s fair to ask, who, or what, killed shopping malls?
Read MoreDining - Gathering Spaces - Offices - Fitness Areas and Locker Rooms - Auditoriums and Performance Areas
We are actively recruiting for qualified applicants to fill a variety of positions.
Read MoreRobert Conte joined the firm as a Senior Designer in the Water and Wastewater Engineering Department. Bob has an AS in Mechanical Engineering Technology from Harrisburg Area Community College.
Joseph Cherinko, EIT joined the firm as a Graduate Engineer in our Water and Wastewater Engineering Department. Joe has a BS in Environmental Engineering from Wilkes University.
Manure from the cows at Furnace Stream Farm, Windsor Township, is prevented from leaching into the Furnace Creek under efforts that are part of the Delaware River Watershed Initiative.
Read MoreFreshwater harmful algal blooms (HABs), most notably Cyanobacteria blooms, were formerly known as blue-green algae blooms, and are found in lakes, rivers, ponds and other surface waters.
Read MoreBy providing real-world ongoing simulation of your municipality’s hydraulic and water quality behavior, our modeling services visualize every variable and interrelation within a water distribution network.
Read MoreSSM provided a full range of construction stakeout and surveying services to L.F. Driscoll for the $354 million construction of a 476,000 SF surgical tower expansion on the Tower Health System campus.
Read MorePV Solar System and Car Charging Station
Read MoreWastewater Treatment Plant Emergency Assessment
Read MoreSSM provided a Topographical and Building survey using conventional and HDS (High-Density Scanning) technology.
Read MoreClean and sustainable drinking water is an essential element of the quality of life for any community.
Read MoreAmendment highlights to the Underground Utility Line Protection Law which went into effect April 28, 2018.
Read MoreUpdates existing regulations pertaining to treatment technique requirements for pathogens, permit fees, and monitoring and reporting requirements.
Read MoreThe Disinfection Requirements Rule (DRR) was published in the PA Bulletin on April 28, 2018. The amendments are intended to protect public health through a multiple barrier approach designed to guard against microbial contamination by ensuring the adequacy of treatment designed to inactivate microbial pathogens and the integrity of drinking water distribution systems.
Read MoreThe Department of Environmental Protection (DEP) announced the creation of a new water quality project grant program funded by the penalty assessed against the Mariner East 2 (MEII) Pipeline.
Read MoreCopyright © SSM Group, Inc. 2020. All Rights Reserved.